Wednesday, 27 May 2015

New floor

CVR delivered my new floor today and it is flat. 
Got cracking straight away drilled for the fixings then lifted the floor on blocks. I superglued M14 washers over every chassis fixing hole to maintain the thickness for the adhesive, keyed and then primed the whole chassis and the underside of the floor.  Applied 252 to all of the chassis members then dropped the floor back into position.  Bolted down with M12 high tensile bolts through 40 mm stainless load spreading washers wherever it won't be visible.

No comments:

Post a Comment